Every 6 months, each Beneficiary submits a consolidated report covering the progress of the different WP aspects. Periodic reports include:
- Technical progress
- Results
- Compliancy Summary
- Management level information (resources, costs, delays)
The PC will synthesize the overall project status and planning. For the attention of the Joint Call Secretariat (JCS), the following reports will be prepared by the MB and officially supplied by the PC:
- Semester Progress Reports – concise description of all activities undertaken with respect the objectives, action and work plan envisaged in the project.
- Mid-term Report – detailed description of the activities undertaken with respect to the objectives, actions and work plan envisaged in the project during first 12 months.
- Final Report: contains a summary of the main achievements and results of the project.
The following Deliverables are foreseen in the framework of GEOURBAN:
# |
Name |
Responsible |
Delivery Date |
√ D.1.1 | Project Management Plan. |
FORTH |
M3 |
√ D.1.2.i | Semester Progress Reports |
FORTH |
Semester |
√ D.2 | Urban Planning Requirements relative to EO |
UNIBAS |
M6 |
√ D.4.1 | EO Products Database (VHR) |
KUZGUN |
M6 |
√ D.4.2 | EO Data Analysis Protocol (VHR) |
KUZGUN |
M6 |
√ D.9.1 | Dissemination and Use Plan |
GARD |
M6 |
√ D.9.2 | GEOURBAN Web Site. |
GARD |
M6 |
√ D.5.1 | EO Products Database (HR-LR) |
UNIBAS |
M12 |
√ D.5.2 | EO Data Analysis Protocol (HR-LR) |
UNIBAS |
M12 |
√ D.1.3 | Mid-term Report |
FORTH |
M12 |
√ D.9.3.i | GEOURBAN Published Material. |
GARD |
Periodically |
√ D.6 | Guidelines for Future Missions Data Analysis |
DLR |
M15 |
√ D.3 | EO-based Indicators Development |
FORTH |
M18 |
√ D.7 | GEOURBAN Information System |
GRADI |
M20 |
√ D.8 | Demonstration Proceedings |
GARD |
M22 |
√ D.1.4 | Final Report |
FORTH |
M22 |